Basic Facility Required for Hydrogen Generation Equipment | Electrical Power | 380V, 50Hz, 3phases 4 wires, 65kw |
Methane CH4 | comply with GB17820-2018 stardard | |
Deionized water | Meets the standard for industrial pure water application standard Chlorine ion<=1mg/L, Conductivity<=5u s/cm | |
Cooling Water | 4t/h, industrial cooling water, soft water, water temperature<=30 ° C | |
Nitrogen | Purity greater than 99.5% (used for blowing off during equipment startup) | |
Consumption Reference | Electrical Consumption | 1.7kw/Nm3-H2 |
Methane CH4 | 0.32 Nm3/ Nm3-H2 | |
Deionized water | 0.5kg/ Nm3-H2 | |
Purity | 99.9%(CO+CO2<10PPM) | |
Fluidity | 20Nm3/h |